Product Features
- No machine room is required above the shaft. Installation can be completed with a top-floor headroom of 3.5 meters or higher.
- The hydraulic power unit can be installed within a 15-meter radius of the shaft, requiring only 3–4 m² of floor space.
- No counterweight system is required, maximizing the usable shaft space and improving space utilization.
- Smooth and stable operation, with low noise, easy maintenance, and reliable long-term performance.
Product Specification
|
Application |
Heavy-Duty Vertical Material Handling |
|
Material |
High-Strength Manganese Steel |
|
Load Capacity |
0.2–60 Tons |
|
Lifting Height |
1–48 m |
|
Power Supply |
380V / 220V |
Custom Services
We provide dedicated one-on-one support from initial consultation through after-sales service. Every product can be custom-built to meet your specific requirements, with flexible options for load capacity, platform dimensions, lifting height, and other key specifications to ensure the perfect solution for your application.
Product Applications
- Manufacturing factories
- Warehouses and distribution centers
- Industrial buildings
- Office buildings
- Multi-story commercial buildings
- Logistics centers
- Processing plants
Suitable for: Buildings with existing or newly constructed elevator shafts.
FAQ
Q1: What buildings are shaft installation cargo lifts suitable for?
A1: Shaft installation hydraulic cargo lifts are ideal for factories, warehouses, office buildings, and other facilities with existing or newly constructed elevator shafts.
Q2: Does a shaft installation cargo lift require a machine room?
A2: No. Most models do not require a separate machine room. A top clearance of approximately 3.5 meters is generally sufficient for installation.
Q3: Can the shaft dimensions be customized?
A3: Yes. We can customize the platform size and equipment dimensions according to your existing shaft size and lifting requirements.
Q4: How long does installation take?
A4: Installation time depends on the equipment size and site conditions. Standard hydraulic cargo lifts can typically be installed within 3–7 days after the site is prepared. Our engineering team will provide detailed installation guidance, and overseas installation support is available upon request.
Q5: What after‑sales service do you provide?
A5: We provide comprehensive after‑sales support, including technical consultation, installation guidance, maintenance assistance, spare parts supply, and online troubleshooting. All equipment is backed by a 1‑year machine warranty, and our technical team is ready to provide prompt support whenever needed.